- Approximately 19,800 m3 LLRW in the Temporary Storage Site – COMPLETED 2018
- Approximately 32,000 m3 LLRW
- Property owned by the Municipality of Port Hope, currently leased to Cameco Corporation
Remediation/Restoration Plans
- Removal of the Temporary Storage Site and all buildings on Centre Pier
- Topsoil and mulch will be placed on the previously excavated area and erosion control blankets will be placed and staked as required
- Final grades will be attained with backfill materials and graded to permit surface water runoff
- Waste will travel along the South Transportation Route to the Long-Term Waste Management Facility
- Final restoration to be developed in consultation with stakeholders and Municipality of Port Hope Waterfront Plan